In this article (click to jump):
- Task 1: Open the box front
- Task 2: Pull the bag forward
- Task 3: Clamp and push it on
- Task 4: Twist left to find the thread
- Task 5: Clamp and twist it on
- Task 6: Dry connection
- Task 7: Inspect the connection
- Task 8: Prime the line
- Task 9: Check for leaks
BIB Connector Installation
Task 1: Open the box front
- Open the front of the box fully so you have complete access to the bag spout.
Task 2: Pull the bag forward
- Pull the bag forward, out of the box, so you can get your hand in behind the spout.
Task 3: Clamp and push it on
- With your fingers behind the bag spout, clamp the spout and the connector together and push the connector onto the bag fitment as shown.
Task 4: Twist left to find the thread
- Still clamping both sides, twist the connector left until you feel it sit at the start of the thread.
Task 5: Clamp and twist it on
CRITICAL: Clamp the spout and connector together as you twist. That pressure is what lets the connector thread past the base of the bag fitment. Pressure alone will not stop a leak; it has to finish fully seated (see Task 6).
- Keeping that clamp pressure on both sides, twist the connector right onto the threads of the bag fitment.
Task 6: Dry connection
- Prior to priming, dry off the connection to ensure no drips are present.
Task 7: Inspect the connection
- Flange fully encompassed within the connector. No gap.
- Visible gap at the spout. Reseat the connection.
Task 8: Prime the line
Hold a cup under the nozzle and tap Prime on screen. It takes about 20 seconds.
- Hold a cup directly below the nozzle.
- Tap Prime for the slot you swapped.
Task 9: Check for leaks
With the line primed, check the connection again. Look for any drips or wet surfaces. A drip means it is not sealed.
- Dry at the fitting. Good to close up.
- Drip at the fitting. Reseat and prime again.