This video demonstrates how to connect the Standup unit online:
Articles in this section
- (SU 1.5 / 1.0 / 0.75) 6-Month Preventative Maintenance Guide
- Backflow Preventer Retrofit/Upgrade Guide for Standup 1.5
- [SOP] Installation Requirements by Machine Type
- How to transport and ship the Standup 2.0 and 1.5
- Bevi Alert Center - USB Cable Disconnected (Standup model 1.5)
- Filling the Ice Bank of a Countertop or V1.x Series Standup model
- Double BiB-ing Full Guide
- [Guide] V1.5 Standup Overview
- [Guide] Repacking the Bevi Standup 1.5, 1.0, 0.75 for RMA/Return Shipping
- [Guide] Flavor Pump Replacement