Required Tools & Parts
- #2 Phillips screwdriver.
Troubleshooting Steps
Task 1: Repeat the Diagnostic Test
- If the test fails, you can first attempt to restart the diagnostic tests to see if it passes on the second attempt.
- If the test continues to fail, power cycle the Bevi via the power switch on the front of the chiller.
- Navigate back through the installation steps to the Install Diagnostic step and repeat the test.
- If the test continues to fail, continue to Task 2.
Task 2: Power Off the Bevi.
- Power off the Bevi using the power switch on the front of the chiller.
- Disconnect the power cord from the back of the chiller.
Task 3: Remove the chiller from the cabinet.
- Carefully lift the front of the chiller so the locating tabs on the bottom can come up and out of the ventilation holes.
- Slide the chiller forward so the front hangs over the edge of the cabinet.
- Remove the red locking clip and disconnect the 3/8" water supply line from the back of the chiller.
- This step may not be necessary if there is enough slack on the water line to fully remove the chiller without putting tension on the tubing.
- Lifting from the front and the rear grab handle, carefully lift the chiller out of the cabinet and place on the floor.
Task 4: Remove the CO2 panel.
- Using a #2 Phillips screwdriver, loosen the two screws securing the CO2 panel to the top of the chiller.
- With the screws fully loosened, lift the front of the panel up, and slide forward to release the rear locating tabs.
- Place the panel to the side.
Task 5: Check the High Side CO2 switch connection.
- The High Pressure CO2 Switch has 2 connections.
- The High Pressure switch first connects from the CO2 Regulator assembly to the top of the chiller in the CO2 Panel.
- Inspect the pressure switch cable. If this cable is not connected or oriented properly, the machine may show a CO2 Leak alert.
- Check electrical connection on top of chiller from the CO2 assembly.
- Ensure cable is fully seated into the connector with the locking tab facing up .
- Inspect the wires and connector for any visible damage or loose pins.
- If there is any damage to the cable or connector, please contact Bevi Support at 866-704-2384.
- If the cable connector was not seated correctly, plug in and power on the chiller after reseating properly, and retest.
- If the test passes, reinstall the panels and continue with installation.
- If the test continues to fail, proceed to Task 6.
Task 6: Remove the PCB panel.
- Using a #2 Phillips screwdriver, loosen the screw securing the PCB panel on the left side of the chiller.
- With the screw fully loosened, lift the panel to release the lower locating tab and remove.
- Place the panel to the side.
Task 7: Check the High CO2 Switch Connection at the BUC Board.
- Check the High CO2 Switch connection to the BUC Board. If this cable is not connected or oriented properly, the machine may show a CO2 Leak alert.
- Ensure cable is fully seated into the connector with the locking tab facing to the left.
- Inspect the wires and connector for any visible damage or loose pins.
- If there is any damage to the cable or connector, please contact Bevi Support at 866-704-2384.
- If the cable connector was not seated correctly, plug in and power on the chiller after reseating properly, and retest.
- If the test passes, reinstall the panels, connect tubing, and continue with installation.
- If the test continues to fail, proceed to Task 8.
Task 8: Confirm a full CO2 tank was installed.
- The High CO2 Switch needs a minimum of 650 PSI to pass the final diagnostic test.
- If the diagnostic test continues to fail after checking switch connections, verify tank pressure.
- Install a gauge onto the CO2 tank and verify tank pressure is 650 PSI.
- If pressure is <650 PSI, install a new CO2 tank.
- Repeat the diagnostic test.
- If the test continues to fail, contact Bevi Support at 866-704-2384.
- If the test passes, continue to task 9.
Task 9: Reinstall the Chiller.
- Reinstall the CO2 and PCB panels.
- Take care not to pinch any wiring in the panels.
- Ensure the locating tabs slot into place.
- Tighten the screws to secure the panel.
- Reconnect the chiller power cord.
- Carefully lift the chiller into place in the cabinet.
- Ensure the locating tabs on the bottom of the chiller fit into the ventilation holes and the chiller sits flush on the base of the cabinet.
- If it was disconnected during removal, reconnect the 3/8" water supply tube.
- Ensure the tubing is fully seated into the push to connect fitting.
- Reinstall the red locking clip.
- Power on the chiller.
Task 10: Repeat the Diagnostic Test
- Proceed through the Installation Wizard back to the Diagnostic Test.
- If the test passes, continue with installation.
- If the test continues to fail, please contact Bevi Support at 866-704-2384.