Required Tools & Parts
- #2 Phillips Screwdriver
- Small Flathead Screwdriver
Troubleshooting Steps:
Task 1: Repeat the Diagnostic Test
- Ensure water and CO2 are turned off.
- Restart the diagnostic tests to see if it passes on the second attempt.
-
If the test continues to fail, power cycle the Bevi via the power switch on the front of the chiller.
- Navigate back through the installation steps to the Install Diagnostic step and repeat the test.
- If the test continues to fail, continue to Task 2.
Task 3: Contact Bevi Support to verify correct Software and Firmware.
- If the 24V Watchdog Test is failing, it may be an indication that the Software and or Firmware did not properly update in previous installation steps.
- Contact Bevi Support at 866-704-2384.
-
Bevi Support can assist in confirming if any Software and or Firmware updates are available.
- This is not an available functionality from the machine while in Install Wizard.
- If any updates are required, Bevi Support will upgrade remotely.
-
If any updates were required:
- Power cycle the Bevi via the power switch on the front of the chiller.
- Navigate back through the installation steps to the Install Diagnostic step and repeat the test.
- If the test continues to fail, continue to next task.
Task 4: Power Off the Bevi.
- Power off the Bevi using the power switch on the front of the chiller.
- Disconnect the power cord from the back of the chiller.
Task 5: Remove the chiller from the cabinet.
- Carefully lift the front of the chiller so the locating tabs on the bottom can come up and out of the ventilation holes.
- Slide the chiller forward so the front hangs over the edge of the cabinet.
-
Remove the red locking clip and disconnect the 3/8” water supply line from the back of the chiller.
- This step may not be necessary if there is enough slack on the water line to fully remove the chiller without putting tension on the tubing.
-
Lifting from the front and the rear grab handle, carefully lift the chiller out of the cabinet and place on the floor.
- When removing the chiller from the cabinet, make sure not to put stress or tension on any electrical connections.
- If needed, disconnect the USB and 24V Head Unit Power cables to avoid damage.
Task 6: Remove the left side panel.
- Using a #2 Phillips screwdriver, loosen the two screws securing the top panel of the chiller.
- With the screws fully loosened, slide the the panel up to release the locating tabs at the base.
- Place the panel to the side.
Task 7: Remove the PCB panel.
- Using a #2 Phillips screwdriver, loosen the two screws securing the PCB panel on the left side of the chiller.
- With the screws fully loosened, lift the panel to release the lower locating tab and remove.
- Place the panel to the side.
Task 8: Check the BUC Board 24V Power Supply Connection.
- Locate the 24V Power Cable connection on the BUC Board.
-
Inspect the wires and connector for any visible damage.
- If there is any damage to the cable, connector, or loose pins, please contact Bevi Support at 866-704-2384.
-
Gently disconnect, and reconnect the 24V cable.
- There is a lock latch on the right side of the connector that needs to be depressed to disconnect the cable.
- When reconnecting, ensure the connector is fully seated and clicks into place.
Task 9: Check the 24V Power Supply.
-
Remove the 24V Power Supply.
- Using a flathead screwdriver, push on the tab securing the power supply in the PCB housing and simultaneously pull on the power supply.
- Confirm the large white 120VAC connector is properly seated.
-
Inspect the wires and connector for any visible damage.
- If there is any damage to the cable, connector, or loose pins, please contact Bevi Support at 866-704-2384.
-
Gently disconnect, and reconnect the cable.
- There is a lock latch on the connector that needs to be depressed to disconnect the cable.
- When reconnecting, ensure the connector is fully seated and clicks into place.
- Confirm the yellow/green ground wire is connected securely.
- Confirm the yellow and black 24VDC cables are connected securely.
-
Reinstall the 24V Power Supply.
- Slide the power supply back into the slot in the PCB housing.
- Ensure the metal tab locks into place.
Task 10: Reinstall the Chiller.
-
Reinstall the left side panel, and the PCB panel.
- Take care not to pinch any wiring in the panels.
- Ensure the locating tabs slot into place
- Tighten the screws to secure the panel.
- Reconnect the chiller power cord.
-
Carefully lift the chiller into place in the cabinet.
- Ensure the locating tabs on the bottom of the chiller fit into the ventilation holes and the chiller sits flush on the base of the cabinet.
-
If it was disconnected during removal, reconnect the 3/8” water supply tube.
- Ensure the tubing is fully seated into the push to connect fitting.
- Reinstall the red locking clip.
- Power on the chiller.
Task 11: Repeat the Diagnostic Test
- Once the Bevi starts up, continue through the Install Wizard back to the diagnostics step.
-
Rerun the test.
- If the test passes, continue with Installation.
-
If the test continues to fail, please contact Bevi Support at 866-704-2384.
- If the Compressor Current test continues to fail, it could indicate that either the Dispense App version and or Chiller Firmware are out of date.
- Bevi Technical Services will assist in confirming if the unit is up to date, and pushing any necessary SW / FW upgrades.